ARCADIA, CA
Extensive Bathroom Remodel
Our Firms Role: Architectural, Engineering, Permitting, Interior Design, Finish Material Procurement and Construction Project Management
About the project:
Unveiling the Ultimate Bathroom Glow-Up! Look through the photos and videos to witness the jaw-dropping transformation of this once dull and dark bathroom into a modern oasis of luxury and style.
​
From outdated to outstanding! Our full bathroom remodel features a stunning full backsplash wall that screams bold sophistication. The white oak and contemporary vanity bring warmth and modern vibes, complemented by a sleek wall-mounted faucet that adds a touch of high-tech elegance.
​
Say goodbye to the gloom! The marble tile and matte black accents throughout create a harmonious blend of textures and tones, turning this space into a visual masterpiece. The large-scale onyx floor tile takes luxury to the next level, providing a lavish foundation for the entire room.
​
But wait, there's more! The double handheld shower is a game-changer, offering the ultimate spa-like experience. Watch the 'before' video to truly appreciate the dramatic contrast – from a dark, blue, and dull space to this bright, contemporary haven.
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
LOS ANGELES | Extensive Interior & Exterior Remodel.
Project type
Extensive Duplex Remodel
Location
Highland Park, CA
Role
Architectural, Structural Engineering, Interior Design, Construction & Project Management
Built in 1924, this duplex located in the heart of Highland Park needed an extensive remodel interior and exterior. Davis Property Development completed all necessary plans, engineering and design of the duplex as well as project management & co-ordinating subcontractors to complete the construction.
This project entailed a full remodel of the kitchens, bathrooms, bedrooms and flooring throughout the interior of the home. On the exterior, we reinforced the existing foundation, added a new shear wall, windows and brand new hardi-plank siding.
The home remodel was completed in just over 4 months, added over $400,000.00 in instant equity and is now a cash flowing property for our new investor!